Railway bridge in Solikamsk
р.
р.
Defects: the disintegration of concrete beams; rebar corrosion; insufficient bearing capacity.
Results: Prevention the bridge destruction; load-bearing capacity restored; increased service life.
City: Solikamsk
Structure: Beam / girder
Building Type: Infrastructure
Left
Right